MIAMI (CBSMiami) – A few more traffic changes are on the way for Key Biscayne drivers.

The Rickenbacker Toll Plaza will get new SunPass equipment and lane closures will resume for the Bear Cut Bridge Project.

READ MORE: COVID Sniffing Dogs Helped Out At Pinecrest Jazz Festival

Starting Monday, March 31, 2014 and lasting for nearly two weeks, two lanes at the Rickenbacker Toll Plaza (lanes 5 and 6) will be closed to traffic as the Public Works and Waste Management Department begins demolition of the existing lane separator and resurfacing of the lanes to prepare for the installation of the new equipment.

While the work is being completed, six toll lanes will be open at all times.

READ MORE: Doral Police Need Help Finding Missing Man Thomas Graham

Beginning Monday, April 14, 2014, lanes 5 and 6 will be closed during weekdays for equipment installation. During weekends, lanes 5 and 6 will reopen so that all eight lanes are operational.

On March 31, 2014, nightly lane closures for the Bear Cut Bridge Project will resume from 8 p.m. to 6 a.m. These lane closures will occur every night through June 16. One lane will be open in each direction.

 

MORE NEWS: COVID-19 Testing Sites In South Florida