Local

Bridge Construction To Close SR 826 Ramp

View Comments
(Photo Credit: www.826-836.com) Southwest aerial image of 826-836 Interchange prior to construction

(Photo Credit: http://www.826-836.com) Southwest aerial image of 826-836 Interchange prior to construction

MIAMI (CBSMiami) – Drivers heading south on the NW 25 Street won’t be able to exit onto SR 826 ramp until February 19 due to construction.

The ramp will be closed so crews can begin the construction of a bridge foundation.

Drivers can:
• Exit at NW 36 Street
• Go west to NW 79 Avenue or east to NW 72 Avenue
• Turn south to access NW 25 Street

During the closures, drivers are encouraged to call 511 before they drive or log on to http://www.fl511.com to get real-time traffic and lane closure information

View Comments
blog comments powered by Disqus
Follow

Get every new post delivered to your Inbox.

Join 13,688 other followers